(1.) BY this application, the appellants have sought for dispensation of duty of Rs. 88,99,183.60 demanded in terms of the impugned order and also a penalty of Rs. 20,00,000/ - levied in terms of the said order.
(2.) THE learned Consultant for the appellants has pleaded that the appellants have installed electricity generating set of 4.5 MW capacity in their factory for captive consumption weighing about 70 metric tonnes. He has pleaded that this generating set was manufactured with various bought out items as also some fabrication work done in the appellants' unit. He has pleaded that the appellants have necessarily to fix the generating set at site and had to provide necessary foundation for the purpose of proper working of the generating set as otherwise vibration etc. would damage the set. He has pleaded that in this view of the matter the generating set should not be considered as goods being affixed on the floor. Alternatively he has pleaded no duty is demandable in respect of the generating set with effect from 21 -1 -1994 from which the sets were exempted from payment of duty and the appellants' generating set came into existence only after the set was put into use on 1 -3 -1994. He has pleaded that the learned lower authority in his order has held that the generating set was physically complete on 21 -1 -1994. While not denying this position, he has pleaded that this set on that date could not have been taken into use as some inspection was required to be carried out by the electricity authorities and the permission for this also had to be given by them. He has pleaded that the inspection of the set was carried out on 2 -2 -1994 and thereafter the Defect Memo was received from the Chief Inspector on 5 -2 -1994. The appellants rectified those defects and submitted their compliance report on 19 -3 -1994. He is not able to say when these defects were removed. He has pleaded that for the purpose of excise levy the relevant date for levy of duty will be 19 -3 -1994 when the compliance report was sent. It is only after the removal of these defects that the appellants could have been permitted by the electricity authorities to take the generating set into use. As it is, the permission from the Electricity authorities was received only in July, 1994. By issue of Notification on 1 -3 -1994 he has pleaded the generating sets were exempted from payment of duty. He has pleaded therefore the appellants should not be held liable to pay any duty in the background of these facts.
(3.) THE learned JDR pleaded that admittedly the generating set had come into existence physically on 21 -1 -1994 and in fact the appellants had done test run after that date before 1 -3 -1994 and therefore the set can be taken to have been ready and the same can be taken to have been used captively with effect from that date. He has pleaded that the appellants had not informed the authorities about the coming into existence of this generating set and came on record for excise purposes only much later. He has pleaded that the appellants are therefore liable to pay duty and they are also liable for penalty.